← Back to all projects
Nord Stream I — servicing and maintenance since 2012
Following the successful commissioning of the Nord Stream pipeline (Nord Stream I) in November 2011 — a project in which ELCON LED was entrusted with laying special cables, designing and installing electrical systems and connecting electrical measuring points and devices — the installation is now in operation.
Since 2012, ELCON LED has been responsible for servicing and maintaining the operating systems.
Information taken from elcon-led.com.